2026 District Infrastructure Replacement Project Areas and Schedule

The 2026 DIRP projects are organized into four construction schedules: DIRP 2026 #1, DIRP 2026 #2, DIRP 2026 #3, and DIRP 2026 #4.

2026 Construction Schedule

DIRP 2026 #1 Schedule

  • Mobilization: TBD
  • Asphalt Milling: TBD
  • Waterline Installation: TBD
  • Project Completion (DIRP #1): August 2026

DIRP 2026 #2 Schedule

  • Waterline Installation, S Braun St: Waterline Intallation Completed, Paving starting 6/5
  • Waterline Installation, S Arbutus St: Waterline Intallation Completed, Paving to be scheduled.
  • Waterline Installation, W Tennesse Dr: Started June 4
  • Waterline Installation, S Yank St: Starting Late June/July
  • Waterline Installation, S Zang, W Florida Pl, & S Zang Ct: Starting Late June/July
  • Waterline Installation, S Yank St: Starting Late June/July
  • Project Completion (DIRP #2): 08/05/2026

DIRP 2026 #3 – Draft Schedule

  • District, Lakewood, Denver Water Reviews: 04/06/2026 – 06/29/2026
  • Change Order into DIRP #1: 08/24/2026
  • Project Completion (DIRP #3): 11/20/2026

DIRP 2026 #4 – Draft Schedule

  • District, Lakewood, Denver Water Reviews: 04/06/2026 – 06/29/2026
  • Change Order into DIRP #2: 08/05/2026
  • Project Completion (DIRP #4): 11/03/2026

2026 Construction Map:

The image is a map showing water main lines for the Green Mountain Water and Sanitation District, planned for 2026.